Multi-level BOMs Management Made Easy
Create single/multi-level BOMs within the system, and select a specific BOM for finished goods or semi-finished goods under multi-level BOM during subassembly. WrkPlan enables you to manage and compare both single and multi-level Bill-of-Material in a hierarchical structure that includes material quantities, description, and cost and prevents any error in preparing the production formula. Direct all your BOMs in the Material Resource Planning with ease.
- Monitor production cost based on your BOM
- Control your production cost and labor cost
- Create and Manage single or multi-level BOM
- Optimize your inventory and avoid stock wastage